Projects
K&S Has completed many Large Scale Project these are just a few of the many.
RAIL SPUR PROJECT
2016-2017
The rail spur took place in Holly refinery in Tulsa, March of 2016 to Fall of 2017. The Rail Spur consisted of over five miles of storage track. K & S supplied excavations needed to get to sub grades and installation of AGG Base, 4,000 ft of French Drain Systems, over One mile of ditching and rerouting over 3,00 ft of Firewater systems along with building 1,200 ft of new asphalt road. K&S also poured Concrete foundations and slabs over existing pipelines.
AGG BASE CRANE PAD
April 2006
If you're looking for a general contractor to manage a really complex job, consider this a testament to our abilities to deliver quality results on time. We worked closely with our client to understand their specific needs and requirements for this specific project and the success of the outcome speaks for itself. The pad we constructed was designed to withstand and uphold the 800 Tons crane in this picture.
Cushing Connect Pipeline
The Cushing Connect Pipeline was a pipeline spanning over 55miles from Cushing to Tulsa. K&S built over 7 Sites for this project consisting each of excavation, concrete, gravel, clearings, and fencing. The start site in Cushing was a field over 8 acres that we had a cut of 11 ft on one side spanning over the 8 acres to fill the other half. This site required our skills of everything we offer as a company from fencing, concrete, excavation, graveling, leveling, clearing.